Construction Hoist Communication System

  • Model NO.: MCK-1508
  • Application: Hoisting Machinery
  • Condition: New
  • Color: as Your Requirement
  • Over Sea Sales Service: Available
  • Shipping Method: by Air
  • Packing Material: Wooden Case
  • Trademark: RUIBIAO
  • Specification: TR-DJHJ-A
  • HS Code: 8431390000
  • Type: Hoist Calling System
  • Certification: ISO9001: 2000
  • Country of Original: China
  • Minimium Order Quantity: 20 Sets
  • Delivery Date: 5 Working Days After Payment Arrived
  • Loading Port: Shanghai
  • Payment: Tt & LC Combine
  • Transport Package: Wooden Case
  • Origin: China

Construction Hoist Communication System
Construction Hoist Communication System

Construction Hoist Communication System
Construction Hoist Communication System

Product Description
INTRODUCTION
Site: Used in the industrial elevator of the building elevator and the construction hoist
Function: Provides an emergency call between the construction of the floor inside the building and elevator driver. Greatly improves the production efficiency, and effectively prevent accidents
Strength: Used in the construction of the elevator intensive areas of reliable use(the radio frequency needn't apply)

FUNCTIONAL FEATURE 
The signal transmission is carried out by using the protection loop line. the signal is stable and reliable, and the special communication cable is not required. 
The signal line and power line are not connected with high voltage, and the system is safe and reliable. 
No electromagnetic wave pollution, do not need to apply for radio frequency, and can be used in the construction of the elevator intensive and authentic and other construction areas, and will not affect each other. 
Press the button for intercom function. It can prompt the communication is busy. It also has the squelch function. 
Electronic volume control, convenient volume adjustment. 
There is an alarm button, can be used in emergency. 
Three frequencies available, voice clear and natural.  
SPECIFICATION PARAMETER
Supply Voltage: 220V AC or 110V AC
Effective Range: more than 300m(Conductor loop resistance<600 ohm)
Three Frequencies Available: 250KHz, 741KHz or 800KHz

SYSTEM INSTALLATION
Installation instructions for each floor
The installation method of the intercom on each floor can be referenced to the left of the following view. Fit the intercom and connect the intercom with the accessory power cable. Note: a dedicated power supply device can only drive less than twenty. In accordance with the drawings, another port dedicated power supply connected to the junction box, and then connected to the coupler. In the first floor of the construction elevator, the protective ground wire passes through the hole of the coupler, and it is connected with the ground. Important note for installation, in the communication system, the protective grounding wire passing through the coupler can not be grounded in the middle ground. 
Installation instructions in the lifting cage of construction hoist
The installation method of the cage intercom see below right view. In accordance with the drawings, connect the intercom, the call device power supply, and the coupler. In the lift cage, the protective ground wire passes through the hole of the coupler, and it is connected with the ground. 

Description of terminal of special power supply device: 

NO    Cable Explain
1 L Power(blue)   
2 N Power(brown) Three core cable
3 G Ground(yellow)   
4 -V Cable shield   
5 -V Negative power(brown) The four core shielded
6 +V Positive power(black) cable
7 +V Positive power(blue)    

After the power supply is turned on, the channel frequency LED and the Transmitting / receiving LED are red at the same time. At this time, if the system is not used, they turn green. If people use the intercom, the channel frequency LED is red. At this time, you can push,  buttons to adjust volume. Press "talk" button and talk to the microphone above emergency while the channel frequency indicator's green. (effective range 10-20cm). 

COMMON USAGE ISSUESANDEXPLAIN
FAQ Explain
Communication Failure The protective ground wire of the coupler is grounded in the middle ground, and the protective earth wire and the ground wire in the hanging basket are not connected.
Poor communication High resistance caused by ground wiring and/or poor connection.
Interference caused by electric motor Cables require better sheielding.

 

 


Construction Hoist Communication System

Construction Hoist Communication System

Mickey
Mobile: +86 18267343860
Address:No.2988 Yindu Rd,Minhang District,Shanghai,China.

42mm Friction Bolt

China 42Mm Friction Bolt,Split Set Bolt supplier & manufacturer, offer low price, high quality Mining Bolt,Split Set Rock Bolts, etc.


Split set bolt is also called "Split Set Stabilizer". It was successfully developed by American Professor Scott in the early 1970s. It was used as a patented product by Ingersoll Rand for mining support. In the early 1980s, the Beijing Institute of Well Construction conducted exploratory tests on slotted pipe anchors in the laboratory and achieved good results. Later, it was gradually promoted and applied in the coal system.


Split set bolt is a underground mining support product. It has simple installation process and convenient use. It has strong anchoring force and tensile strength in underground mining and shotcrete support. It has Large force, strong expansion force.


Split set bolt has good supporting effect. Bolt support conforms to modern rock mechanics and surrounding rock control theory in terms of support principles, and belongs to active support. After the bolt is installed, the stability of the surrounding rock can be mobilized and utilized, and the bearing capacity of the surrounding rock can be fully utilized, and controls the deformation of the surrounding rock of the roadway effectively.so split set bolt can protect the stability of the surrounding rock of the roadway and improve the maintenance of the roadway.


Split set bolt has simple installation and labor saving. It uses fewer supporting materials and lighter weight than other bolts. When tunneling, the transportation volume of supporting materials is reduced, and the labor intensity is greatly reduced, which is conducive to improving the efficiency of tunneling.

42Mm Friction Bolt,Mining Bolts,Rock Bolting,Mining Stabilizer

ANTO MINING EQUIPMENT CO.,LTD , https://www.antobolts.com