2 Cavity Thin Wall Container Lid Mould
Pre-insulated Pipe Fabrication
Pre-insulated, pre-fabricated jacketed piping system is used for industrial and commercial applications. Pre-Insulated, pre-jacketed thermal pipe has a definite advantage over field installed insulation and jacketing. All straight sections of the factory preinsulated piping system shall be jacketed with a High Density Polyethylene (HDPE) jacket conforming to ASTM D1248,PVC jackets shall not be allowed.
All field butt joints shall be made in straight sections of pipe.here for welding polyethylene, it can use field hdpe pipe Butt Fusion Machines according to pipe range. For PE Pre-insulated pipe fabrication, It will use workshop fitting machines for bend fabrication of plastics. How it works? Firstly you need to prepare pe pipe Angle Cutting Saw and fix thin pipe on sepcial clamp, and then cut hdpe pre-insulated pipe in required angle. Then move this pipe and fix them on elbow clamps of pre-insulated fitting welding equipment. Special half heating plates positioned on top of the welding zone are used to ensure the required welding temperature, The appication of uniform welding pressure which is controlled hydraulically, ensures the quality of the weld between the sleeve and the pipe casing. The welding phases of pipe fabrication are below: 1. Approaching and preheating 2: Heating 3.Removing the heating element 4. Reaching the welding pressure 5.Welding 6. Cooling
Pre-Insulated Pipe Fabrication,Custom Pipe Fabrication,Pipeline Fabrication,Butt Fusion Welding Machine WUXI MEIERTE MACHINERY TECHNOLOGY CO.,LTD , https://www.pipefusionwelding.com
2 cavity thin wall container lid mould
As a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.
Following information is essential for your better understanding on our moulds
Name Description
Products' infomation we need to make quotation Clear Pics/material/size/weight/wall thickness/targetting quantity and etc.
Mould Material 45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKD61 etc
Mould Base LKM, HASCO ect.
Cavity Single/multi
Runner Hot/cold
Mould Design 3D/2D Drawing
Design Days 3 days
Design Software UG, PROE, CAD, CAE, CAM, CAXA ect
Plastic Material PP, PC, PS, PE, PU, PVC, ABS, PMMA ect
Mould Life 300, 000-3, 000, 000 shots
Injection System Pin-point-gate
Polish System Mirror Polish
Payment 40% of Deposit by T/T, 60% of Balance by T/T
Delivery Time 15-60days
Specification Depends on customers requirements
Business StepÂ
1. R& D
We support customer R& D. Make the files or improve the design if you neededÂ
↓ ↓ ↓
2. Quotation Making
Mould Quotation will be finished in 1 day according to information we get
↓ ↓ ↓
3. NegotiationÂ
The quality, price, material, delivery time. payment item. ectÂ
↓ ↓ ↓
4. Mould DesignÂ
3-5 days for mould and product 3D/2D drawing design
↓ ↓ ↓
5. Mould
According to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 daysÂ
↓ ↓ ↓
6. Mould Testing
When moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference.
↓ ↓ ↓
7. Sample shootÂ
If the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactoryÂ
 ↓ ↓ ↓ Â
8. DeliveryÂ
Delivery goods by sea or by air, according customers requirementÂ