Model NO.: Filter cover PLUG
Runner: Hot Runner
Design Software: UG
Installation: Fixed
Certification: ISO
Standard: HASCO
Customized: Customized
Cavity Number: One Cavity
Ejection Type: by Robot
Mold Life Guarantty: 1,000,000 Cycles for Production Tool
Hot Runner Trade Name: Moldmasters, Synventive Will Be Considered
Cycle Time: 10-100 S
Injection Machine: 50-1200 Ton
Ejector System: Mechanical
Injection System: Sprue Gate/Pin Point Gate/Edge Gate/Sub Gate, etc
Mold Base Standard: Dme/Lkm/Hasco, etc
Core &Cavity Steel: 738h/P20/H13/2344/1.2344/1.2738, etc
Trademark: Enuo Mold
Transport Package: Put Into The Wooden Box with Vacuum Package
Specification: 860*1000*900mm
Origin: Dongguan of China
HS Code: 8480719090
Model NO.: Filter cover PLUG
Runner: Hot Runner
Design Software: UG
Installation: Fixed
Certification: ISO
Standard: HASCO
Customized: Customized
Cavity Number: One Cavity
Ejection Type: by Robot
Mold Life Guarantty: 1,000,000 Cycles for Production Tool
Hot Runner Trade Name: Moldmasters, Synventive Will Be Considered
Cycle Time: 10-100 S
Injection Machine: 50-1200 Ton
Ejector System: Mechanical
Injection System: Sprue Gate/Pin Point Gate/Edge Gate/Sub Gate, etc
Mold Base Standard: Dme/Lkm/Hasco, etc
Core &Cavity Steel: 738h/P20/H13/2344/1.2344/1.2738, etc
Trademark: Enuo Mold
Transport Package: Put Into The Wooden Box with Vacuum Package
Specification: 860*1000*900mm
Origin: Dongguan of China
HS Code: 8480719090
Auto Water Filter Part for Mould Manufacturing in Dongguan China
Customer: |
Domestic customer |
Project No.: |
Filter cover PLUG |
Material: |
PA66-GF30/BASF |
Cavities: |
1*2Cavs |
Mold Size: |
500*300*500 mm |
injection Gates: |
 Hot runner |
Mold main steel: |
1.2344 |
Lead-time: |
6 weeks(including design time). |
Â

Â
Â


Â
Auto Water Filter Part for Mould Manufacturing in Dongguan China
Customer: |
Domestic customer |
Project No.: |
Filter cover PLUG |
Material: |
PA66-GF30/BASF |
Cavities: |
1*2Cavs |
Mold Size: |
500*300*500 mm |
injection Gates: |
 Hot runner |
Mold main steel: |
1.2344 |
Lead-time: |
6 weeks(including design time). |
Â

Â
Â


Â
Casting Tray
Casting Tray,Steel Casting Rack,Casting Material Rack,Furnace Tray
Taizhou Xinyuan Machinnery Co.,Ltd , https://www.xinyuanmachinery.com