Regulations for the treatment of tailings solid waste
Vehicle Bumper,Jeep Wrangler Front Bumper,Jeep Gladiator Bumper,Jeep Bumpers Guangzhou Dongsui Auto Accessories Co., Ltd. , https://www.dongsui4x4.com
2. beneficiation plant must have a sound tailings disposal facilities, non-tailings discharged into rivers, lakes and sea.
3. The design of the tailings facility should meet the following requirements:
For the tailings with practical use value, the requirements for comprehensive utilization should be considered; the tailings clarified water should be fully recycled and discharged to the downstream; the tailings storage facilities must have measures to prevent tailings loss and tailings dust flying.
4. To transport waste water ditches and pipelines containing toxic or harmful substances, measures must be taken to prevent leakage and corrosion.
5. tailings downstream might crash important towns, industrial and mining enterprises or trunk railway suffered severe damage, its design can improve the first-class level.
6. For the storage of tailings reservoirs, such as uranium mines, which have radioactive or harmful tailings, which may cause extremely serious damage to the downstream environment after the accident, the flood control standards shall be improved. If necessary, the flood control at the later stage may be designed according to the maximum possible flood.
7. When the harmful components in the effluent from the tailings dam exceed the standard, the intercepting dam and the seepage recovery pumping station should be installed downstream of the dam to discharge the leaked water or use it after reaching the standard.
8. When the tailings water discharged downstream is not up to the national industrial “three wastes†discharge standard, the tailings water treatment system should be designed.
3. Facilities for the treatment of fine-grained water-bearing tailings, generally consisting of three systems: tailings hydraulic transport, tailings ponds and drainage (including backwater). The hydraulic conveying system can choose to determine the self-flow or pressure conveying or the combined conveying of the two, and send the tailings to the tailings pond. The tailings can also be concentrated and returned to the water, and then sent to the tailings pond by the sand pump pipeline.